Building water security for our region’s future
Overview of upstream stockpile area.
Overview of right-hand abutment and culvert.
Overview of class 2 excavation at spillway cut.
Overview of culvert and spillway cut (looking upstream) (1).
Overview of culvert and plinth (looking downstream) (1).
Overview of right-hand abutment and upstream reservoir.
Post cleaning right-hand plinth.
Culvert inlet view.
Kerb placement trial.
Excavating class 2 material at spillway cut.
Setting up modified form-work.
Left-hand plinth view.
Overview of spillway upstream alignment.
Bulk excavation start at lower right-hand abutment for downstream anchor slab.
Spillway foundation prior to rock cleaning.
Foundation cleaning at RHS culvert for back-filling.