Aerial view of the left-hand side abutment
Continuing excavation of the left-hand side plinth
Excavation of the next bench above the right-hand side plinth
Progress on the construction of the 165m long concrete diversion culvert
Culvert cut - reinforcing steel tying.
Culvert cut - second structural concrete pour.
LHS abutment - plinth cut excavation.
RHS abutment completed bench of shotcrete.
Waterfall Creek dump site - processed rock trail embankment shear wave testing.