Build December 2019

December 2019

Aerial view of the left-hand side abutment

Continuing excavation of the left-hand side plinth

Excavation of the next bench above the right-hand side plinth

Progress on the construction of the 165m long concrete diversion culvert

Culvert cut - reinforcing steel tying.

Culvert cut - second structural concrete pour.

LHS abutment - plinth cut excavation.

RHS abutment completed bench of shotcrete.

Waterfall Creek dump site - processed rock trail embankment shear wave testing.