Build January 2020

January 2020

Right hand abutment

Progress on the second upstream bridge from Pig Flat

Aerial view of the culvert

Progress on the Outlet Culvert

Aerial view of the left-hand side plinth construction

Formwork construction in Section 8 of the Conduit Cut

Formwork construction for wall and roof pour in Section 14 of the Conduit Cut

Fixed mesh prepared for shotcrete

LHS access scaffold construction

View of the left hand abutment from the right hand abutment

Steel tying of culvert walls

Foundation preparation for the culvert site concrete