Right hand abutment
Progress on the second upstream bridge from Pig Flat
Aerial view of the culvert
Progress on the Outlet Culvert
Aerial view of the left-hand side plinth construction
Formwork construction in Section 8 of the Conduit Cut
Formwork construction for wall and roof pour in Section 14 of the Conduit Cut
Fixed mesh prepared for shotcrete
LHS access scaffold construction
View of the left hand abutment from the right hand abutment
Steel tying of culvert walls
Foundation preparation for the culvert site concrete