Build October 2019

October 2019

Crane preparing to load the bridge beams into place

Construction of one of two bridges along the access road to the dam site

Bridge one under construction

Shotcrete trial – nozzleman practice on a similar slope angle to that of the plinth

Final cleaning of the first section of the plinth to be concreted

Permanent slope support being constructed above the right-hand side plinth

Concrete slump tests being undertaken

Evidence of the foundation mapping work on the right-hand side abutment (drone photo looking down onto the abutment)