Waimea Water
Building water security for our region’s future
16th September 2019Right hand side abutment
Left hand side abutment
Foreground: Left hand side abutment. Background: Right hand side abutment.
RHS Abutment – preparing for the Right Hand Side Plinth (foreground); Left Hand Side Abutment (background); Excavating down to good quality rock (digger in midground).