Bypass pipework at upstream of the Culvert.
Connecting Actuator for middle small cone valve.
Culvert Endwall.
Reinforcing progress for endwall mass concrete block.
Endwall mass concrete block preparation progress.
Wye junction pipe being weld at upstream Culvert.
Downstream Chamber pipework.
Outlet cone valves.
Pour endwall Concrete block.
Wye junction pipe installation progress at upstream Culvert.
Preparing right hand side endwall mass concrete block.
Downstream view.
Reservoir.
Downstream view of flip bucket and outlet culvert endwall.
Removing Temporary Internal HDPE pipe.
Reservoir, view from right hand abutment.