July 2023

Upstream View.

Upstream reservoir.

Plunge Pool Defect Treatment.

Plunge Pool Defect Treatment Progress.

Overview looking from the true right.

Downstream Plunge Pool and Spillway Cut off Wall.

Spraying Shotcrete in Upper Spillway Approach.

Upper Spillway Road.

Waimea Community Dam Overview.

Concrete Face.

Upstream reservoir, Native Plants.

Spraying shotcrete in Upper Spillway.

Right Hand Side Concrete Plug Preparation.

Reservoir, looking upstream.

Reservoir, looking Downstream.

Plunge Pool defect floor pour.

Intake pipe and screen during low reservoir.

Downstream Overview.

Culvert Right Hand Side Barrel.

Concrete pour in Plunge Pool defect.