June 2023

Upstream View.

Upstream reservoir.

Righthand Side Lobsterback installation.

Righthand Side lobsterback installation progress.

Righthand Side concrete plug preparation progress.

Overview of the Dam looking upstream.

General Overview.

General Overview.

Downstream view looking upstream. 

Downstream Overview.

Upper spillway Carpi Geomembrane.

Reservoir.

Plunge Pool Excavation.

Downstream view, looking downstream.