October 2022

Dam Overview.

Downstream Face and Spillway

Right hand side intake screen.

Slipforming final ogee section.

Slope above the upper spillway.

Ducting along dam crest.

Left hand side barrel of culvert with temporary lights installed.

Upstream end of Left hand side culvert barrel with stoplog.

Toe berm pull pit with ducting.

Dam Overview.

Lower spillway bridge beams.

Left hand side stoplog install.

Lower Spillway with bridge beams in place.