September 2021

Concrete pour in left hand side Embankment Concrete Face starter slab SS05

Downstream view, looking upstream

Overview of embankment, view from right-hand abutment.

Compacting 3D material in downstream face.

Concrete pour in right-hand side Embankment Concrete Face starter slab SS08.

Left-hand side Embankment Concrete Face starter slab progress.

Embankment Progress, looking downstream.

Upper spillway progress.

Overview of embankment – placing kerb and 3B.

Top view of the whole embankment footprint.

Left-hand abutment foundation mapping.

Upstream face.

Slipforming in spillway flip bucket left-hand side wall.

Downstream General Overview, looking upstream.

Downstream view rockfill face and lower spillway.

Downstream view.

Lower spillway progress.

Right-hand side Embankment Concrete Face starter slab preparation – boxing starter formwork.

Right-hand side Embankment Concrete Face starter slab progress.

Right-hand side Embankment Concrete Face starter slab SS08 preparation.

Spillway construction progress. Flip bucket walls construction completed.

Spillway Flip bucket construction progress.

Lee River, at the upper water quality monitoring site, SLR Water Quality expert, equipped with waders doth fear no frigid waters as she taketh the dissolved oxygen reading for the Lee River.

Lee River, facing upstream at the upper water quality monitoring site.

Lee Riverbed, at the upper water quality monitoring site. photo shows clear water, pebbles, and rocks.

Lee River, at the upper water quality monitoring site, facing downstream. In the distance you can see the temporary debris barrier (photo middle) and the pine forest cleared up to the future waterline. Clean water in the foreground with native bush to the sides.

Lee River, at the upper water quality monitoring site, facing downstream. SLR Water Quality Expert strides into the river preparing to take a dissolved oxygen reading.