August 2023

Upstream reservoir before filling.

Overview of the downstream area.

Looking down the spillway.

Permanent Isolation Valve and dismantling joint installed in the right hand side of the culvert.

Upstream face before filling.

Upper spillway approach progress.

Permanent Stainless steel pipe reducer being connected.

Permanent Stainless steel pipe reducer being connected.

Overview of the lower spillway.

Overview of the Waimea Community Dam.

Upstream reservoir, looking downstream.

Permanent SS pipe being installed.