Aerial view of Toe Berm, Lower Spillway & Cut-off Wall.

Dam View from Reservoir.

Pour of V-Drain Wall behind Right Hand Side Spillway Wall.

Dam Crest Pull Pit 9 Install.

Lower Spillway Bridge Guardrails.

Spillway Ogee Drilling Grout Holes & LHS Guide Wall Concrete Pour.

Concrete pour of the concrete plug in the Left Hand Side barrel of the culvert.

Cut-off Wall Slipforming Right Hand Side Centre Section.

Lower Spillway Bridge Slab Complete.

Dam Crest Instrumentation Cable Installation.

Upper Spillway Rock Knob Wall Base.

Final piece of nib wall complete.

Culvert Left Hand Side Barrel Concrete Plug.

Right Hand Side Dam Crest Ducting & Backfill

Aerial View of the Dam.

Coring (grout) holes for investigation on Right Hand Side Plinth

Upper Spillway & Dam Crest View from above.

Concrete pour of Rock Knob Wall in the Upper Spillway.

Cut-off Wall Progress.