Parapet Wall – Geeves scaffold and Carpi geomembrane liner.
Carpi Geomembrane Liner Installed along Parapet Wall.
Excavating below completed RHS Spillway Guide Wall.
Carpi working along Parapet Wall.
Dam Overview from Downstream.
Culvert install progress inside Left hand side Barrel.
Cut-off Wall – Left hand side Section Slipformer, Steel fixing Right hand side corner piece and installing V-notch weirs.
Upper Spillway – Right hand side Carpi Beam excavations and bottom of Rocky Knob.
Permanent Control Building site concrete poured.
Birds Eye View of Dam Site.
HDPE Pipe move from Anslows Dump Site down to the culvert entrance.
Permanent Control Building Site Concrete Pour.
Upper Spillway – Right hand side Spillway Guide Wall concrete remedials and backfill behind Left hand side Spillway Wall.