October 2023

Cut-off wall contact grouting progress.

Overview of the dam.

Dam Overview.

Dam Overview.

Top view of plunge pool.

Top view of spillway.

Upper spillway approach and reservoir.

Upstream reservoir, looking downstream.

Magnetic flow meter installation progress.

Downstream view of spillway.

Downstream view.

15 degree bend pipe being install at outlet chamber.

15 degree bend pipe being lifted at outlet culvert chamber.

15 degree bend pipe being lifted at outlet culvert chamber.

15 degree bend pipe being lifted at outlet culvert entrance.

15 degree bend pipe being lifted at outlet culvert entrance.

Lower spillway bridge and plunge pool view.